 |
 |
 |
|
Gangelter Einrichtung Maria-Hilf, Gangelt
This district hospital, with its 500 beds, specializes in psychiatric care. This
is a sensitive area and it has to be able to rely completely on the perfect
functioning of all technical systems, including standard installations such as
heating, disinfection facilities, electricity and drinking water installations.
HOCHTIEF Facility Management is in charge of the ongoing maintenance and
optimization of these systems - and is thus responsible to physicians and
patients for creating an environment that is conducive to the healing process.
| Services/Special features: | - Service provision within the framework of cost-reduction
- contracting
- PWW boiler installation and local heat distribution
- Technical 1,950 kW condensing appliance (gas/oil)
- 2,900 kW peak load/standby boiler (gas/oil)
- Technical PWW building distribution and control stations
- Optimization of church heating (protection for building structure and
- inventory)
- Hydraulic network refurbishment
- Pump adjustment
- Renewal of ventilation swimming pool/ancillary rooms, heat recovery
- Optimization of process heat supply (thermo-oil 230 oC)
- DDC feedback control generation and consumers, control engineering
- Monitoring of facility operation and energy consumption
- Technical support for construction and refurbishment measures
| | | Client : |
Maria-Hilf Hospital and Nursing Home
| | | Property data: |
Hospital with approx. 500 beds
| | | Investment volume: |
435.000 euros
| | | Cost reduction p.a.: |
66.500 euros
|
|
|
|
|